The addition finally got under way in October 2008, the permits were obtained in 2007, but something always came up and delayed everything. In the meantime the plans, and our needs, kept growing so the building is now 14ft  X 24ft ; it will have power, lights and access through double doors on the south side.

In January the roof was put on and the skylights installed. We have the double doors in place as well. This spring the power was installed, insulation and wallboard put up. The space has a loft area for extra storage and a door cut into the main building. We are now painting the trim and floors. We will be moving things in very soon and that means we can clean up the outside (get rid of tarps and old tent)

Jan 09 Roof 11 Jan 09 Roof 21 Jan 09 Roof 71